2014-05-29 |
DOE Consolidated Report for Board Recommendation 2011-1 Actions 2-8 and 2-9, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) Implementation Plan (IP) |
Letter |
PDF |
2014-05-20 |
Board Recognizes the 2013 DOE Annual Safety System (SSO) Award Recipient |
Letter |
PDF |
2014-05-20 |
Board Recognizes the 2013 DOE Facility Representative of the Year |
Letter |
PDF |
2014-05-16 |
Board Letter Regarding the State of Operations at Savannah River Site (SRS) |
Letter |
PDF |
2014-05-16 |
Board Letter Regarding Criticality Safety at Los Alamos National Laboratory (LANL) |
Letter |
PDF |
2014-05-02 |
Board Summary of Sludge Treatment Project Final Design and Safety Basis |
Letter |
PDF |
2014-05-01 |
Closure Letter for Recommendation 2004-1 |
Letter |
PDF |
2014-04-30 |
Y-12 and Pantex M&O Contract Transition [2014-057] |
Letter |
PDF |
2014-04-28 |
DOE Response to Board Concerns Regarding the Design of the Slurry Transport System in the Pretreatment Facility of the Waste Treatment and Immobilization Plant (WTP) at the Hanford Site |
Letter |
PDF |
2014-04-23 |
Board Closes the Remaining Issue Concerning the Preliminary Design and Safety Basis for Phase I of the Sludge Treatment Project (STP) Richland Operations Office (RL) |
Letter |
PDF |