1996-10-11 |
Trip Report on Los Alamos National Laboratory TA-55 Facility Electrical and Ventilation Systems |
Staff Issue Report |
PDF |
1996-10-08 |
Review of Deactivation and Decommissioning Plans for Buildings 771 and 779 at Rocky Flats Environmental Technology Site, September 17-19, 1996 |
Staff Issue Report |
PDF |
1996-09-23 |
Review of F- and H-Area High-Level Waste (HLW) Tank Closure at the Savannah River Site |
Staff Issue Report |
PDF |
1996-09-16 |
Review of Hanford Tank Farms Draft Basis for Interim Operations |
Staff Issue Report |
PDF |
1996-09-05 |
Review of Operational Readiness for Plutonium-242 Operations at HB-Line, Savannah River Site, August 20-22, 1996 |
Staff Issue Report |
PDF |
1996-09-04 |
On-Site Review of Electrical Systems at the Rocky Flats Environmental Technology Site |
Staff Issue Report |
PDF |
1996-09-03 |
Trip Report on the Reconvening of the Nuclear Explosive Safety Study for the Coded Optical Device Enabling System |
Staff Issue Report |
PDF |
1996-08-28 |
Handling of Spent Nuclear Fuel at the Idaho National Engineering Laboratory (INEL), Trip Report for August 19-23, 1996. |
Staff Issue Report |
PDF |
1996-08-28 |
Fire Protection Visit to Rocky Flats Environmental Technology Site, Building 771 (July 31-August 1, 1996) |
Staff Issue Report |
PDF |
1996-08-19 |
Trip Report - Subcritical Experiments REBOUND-l and HOLOG |
Staff Issue Report |
PDF |