2011-01-26 |
DOE Requesting a 45-Day Extension to Submit the Annual Report on Nuclear Criticality Safety |
Letter |
PDF |
2011-01-25 |
Board Issues a Reporting Requirement to DOE for a Report and Briefing within 30 Days Explaining "Expedited" Review Process and Doe Orders 226.1B and 450.2 |
Letter |
PDF |
2011-01-20 |
DOE Response to the Board's October 22, 2010 Report Regarding Work Planning and Control at the Waste Isolation Pilot Plant |
Letter |
PDF |
2011-01-14 |
DOE Requesting Extension to Respond to Recommendation 2010-1 |
Letter |
PDF |
2011-01-07 |
DOE Transmits Deliverable 5.1 of IP for Recommendation 2009-2 |
Letter |
PDF |
2011-01-06 |
DOE Letter Notifying the Board that Commitments 3.9.1 and 3.13.1 of DOE's IP for Rec. 2001-1 Revision 6 are completed |
Letter |
PDF |
2011-01-05 |
DOE Additional Written Material for the Public Record Regarding Safety Related Aspects of the Design and Construction of the WTP |
Letter |
PDF |
2010-12-30 |
Engineered Container / Settler Tube (EC/ST) Disposition Phase 1 Technical Independent Project Review (TIPR) Report |
Letter |
PDF |
2010-12-29 |
Department Letter Providing a Quarterly Update on the Status of the Structural Steel Peer Review Team at the WTP |
Letter |
PDF |
2010-12-22 |
Summary of Sludge Treatment Project and Related Issues |
Letter |
PDF |