Letters

Start Date Sort ascending Title Document Type Document
2012-01-27 DOE Transmittal of Board Recommendation 2010-2 Implementation Plan (IP) Deliverable 5.3.3.4 Letter PDF iconPDF
2012-01-24 DOE Letter Informing the Board that the DOE has Completed Action 2-1 of the Implementation Plan (IP) for Board Recommendation 2011-1, Safety Culture at the Waste Treatment and Immobilization Plant (WTP) Letter PDF iconPDF
2012-01-19 Board Response to November 10, 2011, DOE Letter Enclosing the Implementation Plan for Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant Letter PDF iconPDF
2012-01-12 DOE Transmittal of Board Recommendation 2010-2 Implementation Plan Deliverable 5.7.3.4 Letter PDF iconPDF
2012-01-06 DOE Forwards December, 2011, DNFSB Recommendation 2010-1 Milestone 6.1.1 Report, "Evaluation of Improvement Areas for the DOE Safety Analysis Development Standard (DOE-STD-3009)" Letter PDF iconPDF
2011-12-27 DOE Forwards the Report, "System for Analysis of Soil Structure Interaction (SASSI) Software Quality Assurance Practices" Letter PDF iconPDF
2011-12-21 DOE Response to Board June 24, 2011, Reporting Requirement Outlining Actions Taken or Planned Regarding the Fire Protection Program at the Waste Isolation Pilot Plant (WIPP) Letter PDF iconPDF
2011-12-09 DOE Response to Board October 6, 2011, Reporting Requirement, enclosing the CH2M Hill Plateau Remediation Company (CHPRC) Waste Encapsulation and Storage Facility (WESF) Corrective Action Plan (CAP) Letter PDF iconPDF
2011-12-09 DOE Letter of Appreciation to Board and Board Staff for Contributions to the Review Process for DOE's Safety Directives Letter PDF iconPDF
2011-12-07 Board Closes Recommendation 2001-1, High-Level Waste Management at the Savannah River Site (SRS) Letter PDF iconPDF