Start Date Sort ascending Title Document Type Document
2007-10-26 DOE Letter Regarding the Savannah River Site Life-Cycle Liquid Waste Disposition System Plan, Revision 14 Letter PDF iconPDF
2007-10-24 DOE Letter Regarding Commitments 2.9, 2.10, and 2.13 for the DOE's Implementation Plan for Board Recommendations 2001-1, High-Level Waste Management at the Savannah River Site Letter PDF iconPDF
2007-10-24 DOE Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials Letter PDF iconPDF
2007-10-23 Board Issues a Reporting Requirement for a Report and Briefing within 60 Days for a Safety Rationale and Schedule for Safe Operation of CMR Letter PDF iconPDF
2007-10-16 DOE Letter Informing that the Central Technical Authority (CTA) for the DOE has Completed Commitment 3 in Revision 2 of the 2004-1 Implementation Plan Letter PDF iconPDF
2007-10-15 NNSA Transfer of Responsibility at Nevada Test Site to the Management and Operations Contractor at NTS Letter PDF iconPDF
2007-10-01 DOE Transmittal of NNSA Central Technical Autority (CTA) Guidance to the Office of the Deputy Administrator for Defense Programs Letter PDF iconPDF
2007-09-14 Board Letter Regarding the Uranium-233 Downblending and Disposition Project in Building 3019 at Oak Ridge National Laboratory Letter PDF iconPDF
2007-09-10 Board Establishing a 90-Day Reporting Requirement Regarding the Overall Strategy and Key Milestones for the Upgrade of the LANL Materials Accountability and Safeguards System (MASS) Letter PDF iconPDF
2007-08-30 DOE Provides an Update to a Previous Letter to the Board (March 27, 2006) Describing Progress Made in NNSA Closing Out Remaining Tasks Related to Historical Supplemental Directives from Field Elements Letter PDF iconPDF