Letters

Start Date Sort ascending Title Document Type Document
2008-04-04 Board Accepts the Implementation Plan for Recommendation 2007-1 Letter PDF iconPDF
2008-04-02 DOE Transmittal of 9212 Continued Safe Operating Oversight Team Annual Report (Y/TIS-302) and The Uranium Processing Facility Project 2007 Annual Report for the Defense Nuclear Facilities Safety Board Letter PDF iconPDF
2008-03-28 DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated Letter PDF iconPDF
2008-03-28 Board Closes Recommendation 98-1, Resolution of Issues Identified by DOE Internal Oversight Letter PDF iconPDF
2008-03-25 DOE Response to Board's October 26, 2007 Letter, Concerning the Safety Rationale for Continuing the Operation of the Chemistry and Metallurgy Research Building at the Los Alamos National Laboratory Letter PDF iconPDF
2008-03-20 Board Issues a Reporting Requirement for a Briefing from NNSA within 60 Days Describing the Risks Associated with Each of the Dismantlement Strategies Being Considered for the B53 Weapon System Letter PDF iconPDF
2008-03-19 DOE Acknowledges Receipt of the Board's Recommendation 2008-1, Safety Classification of Fire Protection Systems, issued on January 29,2008. Letter PDF iconPDF
2008-03-17 Board Issues a Reporting Requirement to DOE for a Report within 60 Days on the Increased Rejection Rate of HEPA Filters at the Filter Test Facility Letter PDF iconPDF
2008-03-11 DOE Response to Board October 16, 2007, Letter that Provided a 60 Day Reporting Requirement Addressing Concerns about the Safety of Nuclear Operations at the Los Alamos National Laboratory Letter PDF iconPDF
2008-02-29 DOE Clarification of Specific Commitments Related to the Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials Letter PDF iconPDF