2008-04-04 |
Board Accepts the Implementation Plan for Recommendation 2007-1 |
Letter |
PDF |
2008-04-02 |
DOE Transmittal of 9212 Continued Safe Operating Oversight Team Annual Report (Y/TIS-302) and The Uranium Processing Facility Project 2007 Annual Report for the Defense Nuclear Facilities Safety Board |
Letter |
PDF |
2008-03-28 |
DOE Request that the Board Provide a Narrow Technical Review of the Mixed Oxide Fuel Fabrication Facility Aqueous Processing Design with Respect to Whether the Intent of the Findings and Recommendations of DNFSB/TECH-33 have been Adequately Incorporated |
Letter |
PDF |
2008-03-28 |
Board Closes Recommendation 98-1, Resolution of Issues Identified by DOE Internal Oversight |
Letter |
PDF |
2008-03-25 |
DOE Response to Board's October 26, 2007 Letter, Concerning the Safety Rationale for Continuing the Operation of the Chemistry and Metallurgy Research Building at the Los Alamos National Laboratory |
Letter |
PDF |
2008-03-20 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 60 Days Describing the Risks Associated with Each of the Dismantlement Strategies Being Considered for the B53 Weapon System |
Letter |
PDF |
2008-03-19 |
DOE Acknowledges Receipt of the Board's Recommendation 2008-1, Safety Classification of Fire Protection Systems, issued on January 29,2008. |
Letter |
PDF |
2008-03-17 |
Board Issues a Reporting Requirement to DOE for a Report within 60 Days on the Increased Rejection Rate of HEPA Filters at the Filter Test Facility |
Letter |
PDF |
2008-03-11 |
DOE Response to Board October 16, 2007, Letter that Provided a 60 Day Reporting Requirement Addressing Concerns about the Safety of Nuclear Operations at the Los Alamos National Laboratory |
Letter |
PDF |
2008-02-29 |
DOE Clarification of Specific Commitments Related to the Implementation Plan for Board Recommendation 2007-1, Safety-Related in Situ Nondestructive Assay of Radioactive Materials |
Letter |
PDF |