2022-12-16 |
Conduct of Operations at SNL Technical Area V [2023-100-005] |
Letter |
PDF |
2022-12-16 |
FY23 Review of DOE Standards |
Letter |
PDF |
2022-12-06 |
Equivalency Request to Disconnect HEPA Filter Deluge System at PF-400 |
Letter |
PDF |
2022-11-18 |
Reactive Material Hazards at Y12 |
Letter |
PDF |
2022-11-08 |
DOE Response to LANL PF-4 Updated Leak Path Factor Analysis Letter of August 11, 2022 (Received by the Board 11.21.22) |
Letter |
PDF |
2022-11-02 |
DOE Response to DNFSB Letter of June 16, 2022 re Complex-Wide USQ for PSHA Update (TECH-47) (Received by the Board 11.03.22) |
Letter |
PDF |
2022-10-28 |
DOE Extension to Respond to DOE Oversight Effectiveness Letter of August 17, 2022 (Received by the Board 11.21.22) |
Letter |
PDF |
2022-10-20 |
Outstanding DOE reporting requirements |
Letter |
PDF |
2022-10-07 |
DOE Response to DNFSB's May 10, 2022 Pantex External Dosimetry Letter (Received by the Board 10.26.22) |
Letter |
PDF |
2022-10-06 |
Hanford TSCR Coupling Thread Damage |
Letter |
PDF |