2015-02-27 DOE Requests a 45-Day Extension to Prepare the Recommendation 2014-1 Implementation Plan (IP) Letter PDF iconPDF
2015-02-13 DOE letter responding to 12/17/2014 Board letter requesting an updated plan and schedule for completing the alternate seismic analysis for the Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4) Letter PDF iconPDF
2015-02-11 DOE letter responding to 10/23/2014 Board letter requesting a written response outlining DOE's intent and plan to incorporate the updated Hanford volcanic ashfall hazard assessment into the WTP design and nuclear facility safety basis. Letter PDF iconPDF
2015-02-11 DOE letter responding to 10/23/2014 Board letter requesting a written response outlining DOE's intent and plan to incorporate the updated Hanford volcanic ashfall hazard assessment into the WTP design and nuclear facility safety basis.. Letter PDF iconPDF
2015-02-06 DOE letter transmitting deliverable for Action 5-1 of the Implementation Plan Letter PDF iconPDF
2015-02-02 DOE Transmittal of Board Recommendation 2012-1 Implementation Plan Action 2c-3 Letter PDF iconPDF
2015-01-21 Hydrogen Control Strategy for High-Level Waste Facility Letter PDF iconPDF
2015-01-15 DOE transmittal of Board Recommendation 2010-1 Implementation Plan Deliverable 6.4.1. Letter PDF iconPDF
2014-12-31 DOE transmittal of the DOE Recommendation 2012-1 Implementation Plan (IP) for Fiscal Year 2014 Letter PDF iconPDF
2014-12-29 DOE letter delivering DOE report "Federal Safety Oversight Capability and Criteria for Oversight of High-Hazard Nuclear Facilities." Letter PDF iconPDF