2002-11-18 |
DOE Compilation of Responses on Issues Regarding the Tritium Extraction Facility Project at the Savannah River Site |
Letter |
PDF |
2002-11-15 |
The Board Requests that DOE Provide a Briefing on the Vapor-Space Corrosion Program Including the Schedule for Actions and Funding Support within 30 Days |
Letter |
PDF |
2002-11-15 |
Board Regarding the Need to Restart Disassembly and Inspection Operations for the W84 Program |
Letter |
PDF |
2002-11-14 |
Summary of the Board's Staff Observations on High Level Waste Building "Load Path Report" |
Letter |
PDF |
2002-11-13 |
Board Issues a Reporting Requirement for a Briefing from NNSA within 30 Days on Safety-Significant Designation for Continuous Air and Radiation Alarm Monitors |
Letter |
PDF |
2002-11-13 |
Board Issues a Reporting Requirement for a Response within 60 Days by DOE/NNSA/DP and the Y-12 Contractor Addressing Criticality Safety for Operations in Building 9212 |
Letter |
PDF |
2002-11-12 |
DOE Regarding Sandia Underground Reactor Facility |
Letter |
PDF |
2002-11-08 |
Board Does Not Believe Conditions for Certification of Section 3137 of the National Defense Authorization Act for Fiscal Year 2001 Have Been Met |
Letter |
PDF |
2002-11-04 |
Board Should be Informed of DOE Activities and Initiatives Aimed at Improving the Integration of Hazard Analyses |
Letter |
PDF |
2002-11-01 |
DOE Performance Incentives at the Savannah River Site |
Letter |
PDF |