2004-08-27 |
Board Issues a Reporting Requirement for a Report from DOE within 45 Days Designating the Salt Waste Processing Facility Confinement Structure with Plan and Schedule for Revising Affected DOE Directives |
Letter |
PDF |
2004-08-24 |
Waste Treatment Plant High-Level Waste Facility: Issues Unresolved in Summary Structural Report |
Letter |
PDF |
2004-08-13 |
Annual Report on Commercial Activities at the Defense Nuclear Facilities Safety Board; FAIR Act |
Letter |
PDF |
2004-08-09 |
DOE Requesting an Additional 90 Day Extension to Submit Report Regarding Conduct of Engineering and Implementation of DOE Order 420.1A, Facility Safety, at the Los Alamos National Laboratory |
Letter |
PDF |
2004-08-06 |
DOE Quarterly Report for the Implementation Plan for Board Recommendation 98-2, Accelerating Safety Management Improvements at the Pantex Plant, for the Period April 1 through June 30,2004. |
Letter |
PDF |
2004-08-06 |
Board Issues a Reporting Requirement to DOE for a Briefing within 45 Days Providing the Results of Evaluations of the Training and Qualification Programs at LANL, LLNL, and NTS in Accordance with DOE Standard 1070-94 |
Letter |
PDF |
2004-08-03 |
DOE Office of River Protection Waste Treatment and Immobilization Plant Low Activity Waste Structural Report |
Letter |
PDF |
2004-07-28 |
Savannah River Site Citizens Advisory Board Letter Complimenting Site Representatives at Savannah River Site |
Letter |
PDF |
2004-07-23 |
DOE Commitment 118E of Revision 2 to the Implementation Plan for Recommendation 2000-1 will Not be Completed by July 31 |
Letter |
PDF |
2004-07-23 |
DOE Revised Implementation Plan for Board Recommendation 2000-1 for Stabilization, Repackaging, or Disposition of Nuclear Materials at Los Alamos National Laboratory |
Letter |
PDF |