2007-06-01 |
Actions Taken by DOE and Its Contractors to Resolve Safety Issues Relative to the Design of the Salt Waste Processing Facility at the Savannah River Site |
Letter |
PDF |
2007-05-11 |
DOE Letter Regarding Structural Analysis and Design of the Salt Waste Processing Facility (SWPF) |
Letter |
PDF |
2007-04-24 |
DOE Provides Status of and Plan to Complete Commitment 2.9 in the 2001-1 Implementation Plan |
Letter |
|
2007-02-09 |
DOE Provides a Report on the Geotechnical and Structural Design of the Salt Waste Processing Facility at the Savannah River Site |
Letter |
PDF |
2007-02-01 |
Interim Status of DOE's High Level Waste Management at the Savannah River Site |
Letter |
PDF |
2006-12-04 |
DOE Program Evaluation: Board Recommendation 2001-1 Implementation Plan Commitment 3.11 |
Letter |
PDF |
2006-10-13 |
Savannah River Operations Office has Completed its Final Commitment Associated with the Implementation Plan (IP) for Board Recommendation 2000-1 |
Letter |
PDF |
2006-09-26 |
Surface Settlement Profiles for the Pit Disassembly and Conversion Facility (PDCF) at the Savannah River Site |
Letter |
PDF |
2006-09-13 |
Recognition of Amy Poston for Her Dedicated Service as the DOE Liaison to the Board upon Her Departure for Her New Assignment |
Letter |
PDF |
2006-08-15 |
Board Issues a Reporting Requirement for a Report from DOE within 30 Days Providing Plans for Implementing Safety Requirements in Doe Order 226.1 |
Letter |
PDF |