2003-04-11 |
Status of Two Savannah River Site Commitments, Packaging of Plutonium Metal and Disposition of Pre-Existing High-Enriched Uranium Solutions, in Revision 2 of the 2000-1 Implementation Plan |
Letter |
PDF |
2003-04-09 |
Vapor Space Corrosion in High-Level Waste Tanks |
Letter |
PDF |
2003-01-21 |
DOE Letter Regarding Commitments 2.9, 3.4, and 3.7 in the 2001-1 Implementation Plan, High-Level Waste Management at the Savannah River Site |
Letter |
PDF |
2002-12-20 |
DOE Project Plan for the Disposition of the Savannah River Site Depleted, Natural, and Low-Enriched Uranium Materials |
Letter |
PDF |
2002-12-19 |
National Nuclear Security Administration’s Responses to Issues Raised by the Board during the Design of the Tritium Extraction Facility at the Savannah River Site |
Letter |
PDF |
2002-11-18 |
DOE Compilation of Responses on Issues Regarding the Tritium Extraction Facility Project at the Savannah River Site |
Letter |
PDF |
2002-11-08 |
Board Does Not Believe Conditions for Certification of Section 3137 of the National Defense Authorization Act for Fiscal Year 2001 Have Been Met |
Letter |
PDF |
2002-11-01 |
DOE Performance Incentives at the Savannah River Site |
Letter |
PDF |
2002-11-01 |
DOE Regarding the Old HB-Line Ventilation System in the Savannah River Site H-Canyon |
Letter |
PDF |
2002-10-21 |
DOE Report on Savannah River Site's High Level Waste Tank 48-H Disposition Alternatives Identification Phase 1 & 2 Relative to the 2001-1 Implementation Plan |
Letter |
PDF |