2004-12-14 |
DOE Natural Phenomena Hazards Design Standards and the Salt Waste Processing Facility at the Savannah River Site |
Letter |
PDF |
2004-12-14 |
Board Issues a Reporting Requirement for a Briefing from DOE within 30 Days Providing a Factual Review of Waste Drum Issues at Savannah River Site |
Letter |
PDF |
2004-10-13 |
DOE Seismic Design of the Salt Waste Processing Facility at the Savannah River Site and DOE Directives on Natural Phenomena Hazards |
Letter |
PDF |
2004-09-01 |
DOE Report to the Committee on Armed Services of the Senate and the Committee on Armed Services of the House of Representatives, and the Defense Nuclear Facilities Safety Board, Concerning Decommissioning of the Savannah River Site F-Canyon |
Letter |
PDF |
2004-08-27 |
Board Issues a Reporting Requirement for a Report from DOE within 45 Days Designating the Salt Waste Processing Facility Confinement Structure with Plan and Schedule for Revising Affected DOE Directives |
Letter |
PDF |
2004-07-28 |
Savannah River Site Citizens Advisory Board Letter Complimenting Site Representatives at Savannah River Site |
Letter |
PDF |
2004-06-16 |
DOE First Report to Congress on Plutonium Storage at the Savannah River Site |
Letter |
PDF |
2004-05-28 |
DOE Plutonium Storage at the Savannah River Site |
Letter |
PDF |
2004-05-14 |
Nuclear Safety Consequences of Proposed Section 3116 of the National Defense Authorization Act for FY2005 |
Letter |
PDF |
2004-03-24 |
Board Issues a Reporting Requirement for a Briefing within 30 Days on DOE's Plan for Processing High Level Waste and Contingency Plan on Funding Constraints at Savannah River Site |
Letter |
PDF |