2004-05-25 |
DOE Response to Letter of November 7, 2003, Regarding the Retrieval, Storage, and Disposal of the Waste Drums Containing Pu-238 |
Letter |
PDF |
2004-05-25 |
DOE Completion of Commitment 111 in Revision 2 of the 2000-1 Implementation Plan |
Letter |
PDF |
2004-05-21 |
DOE Response to Board Reporting Requirement Dated March 24, 2004, Regarding Hydrogen Hazards Related to Non-Newtonian High-Level Waste and Black Cell Design Concept for the Office of River Protection's Waste Treatment Plant at Hanford |
Letter |
PDF |
2004-05-21 |
DOE Response to Board Concerns Identified in Letter of March 23, 2004, on Fire Resistance in Structural Steel at Waste Treatment Plant, Hanford |
Letter |
PDF |
2004-05-03 |
DOE Revised Implementation Plan for Board Recommendation 2000- 1 Concerning Sludge Removal at the K-Basins |
Letter |
PDF |
2004-03-24 |
Board Issues a Reporting Requirement for a Report within 60 days Identifying the Critical Information Needed to Design Mixing Systems for non-Newtonian High-Level Wastes and Complete Black Cell Designs |
Letter |
PDF |
2004-03-23 |
Board Issues a Reporting Requirement for a Report within 60 Days Addressing How DOE Will Ensure that the Proposed BNI Methodology Receives Adequate Review and Comment Through a Peer Review Process |
Letter |
PDF |
2004-03-03 |
Board Issues a Reporting Requirement Requesting the April 30, 2004, Update Promised by the Office of Environmental Management Provide a Revised Implementation Plan for Sludge Disposition |
Letter |
PDF |
2004-02-03 |
DOE Interim Response to Board Letter Dated November 7, 2003, Regarding Retrieval, Storage, and Disposal of Waste Drums at Hanford |
Letter |
PDF |
2004-02-03 |
DOE Status of Commitments on Sludge Removal at Hanford in Implementation Plan (IP) 2000-1 and Low Curie Salt-Waste Process, 2001-1, (IP) Savannah River |
Letter |
PDF |