2011-11-15 DOE Letter Informing the Board that DOE has Completed Deliverable 5.2.3 of the Implementation Plan (IP) for Board Recommendation 2009-2 Letter PDF iconPDF
2011-10-05 DOE Letter Providing a Report Dated September 29, 2011, Describing Planned Actions to Address Issues with the System for Analysis of Soil-Structure Interaction (SASSI) Computer Code Letter PDF iconPDF
2011-09-29 DOE Letter Informing the Board that the DOE Will Require Until November 15, 2011, to Complete Deliverable 5.2.3 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
2011-07-20 DOE Requests 60-Day Extension to Complete Deliverable 5.2.3 of the DOE's Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
2011-06-28 DOE Deliverables 5.2.2 and 5.3.2 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
2011-04-29 DOE Deliverable 5.4.3 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
2011-04-01 DOE Deliverable 5.4.2 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety Letter PDF iconPDF
2011-02-28 DOE Responds to the February 8, 2011 Board Letter Concerning Potential Revisions to the Chemistry and Metallurgy Research Replacement (CMRR) Project Nuclear Facility Safety Strategy and Design Letter PDF iconPDF
2011-02-08 Board Issues a Reporting Requirement for Briefing within 30 days on Actions Taken or Planned by NNSA to Change the CMRR Facility Safety Strategy and Design Letter PDF iconPDF
2010-12-17 Board Accepts Implementation Plan for Recommendation 2009-2 Based on Clarifications and Commitments Made by NNSA Letter PDF iconPDF