2011-11-15 |
DOE Letter Informing the Board that DOE has Completed Deliverable 5.2.3 of the Implementation Plan (IP) for Board Recommendation 2009-2 |
Letter |
PDF |
2011-10-05 |
DOE Letter Providing a Report Dated September 29, 2011, Describing Planned Actions to Address Issues with the System for Analysis of Soil-Structure Interaction (SASSI) Computer Code |
Letter |
PDF |
2011-09-29 |
DOE Letter Informing the Board that the DOE Will Require Until November 15, 2011, to Complete Deliverable 5.2.3 of the Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
2011-07-20 |
DOE Requests 60-Day Extension to Complete Deliverable 5.2.3 of the DOE's Implementation Plan (IP) for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
2011-06-28 |
DOE Deliverables 5.2.2 and 5.3.2 of the Implementation Plan for Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
2011-04-29 |
DOE Deliverable 5.4.3 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
2011-04-01 |
DOE Deliverable 5.4.2 for the Implementation Plan for Board Recommendation 2009-2, Los Alamos National Laboratory Plutonium Facility Seismic Safety |
Letter |
PDF |
2011-02-28 |
DOE Responds to the February 8, 2011 Board Letter Concerning Potential Revisions to the Chemistry and Metallurgy Research Replacement (CMRR) Project Nuclear Facility Safety Strategy and Design |
Letter |
PDF |
2011-02-08 |
Board Issues a Reporting Requirement for Briefing within 30 days on Actions Taken or Planned by NNSA to Change the CMRR Facility Safety Strategy and Design |
Letter |
PDF |
2010-12-17 |
Board Accepts Implementation Plan for Recommendation 2009-2 Based on Clarifications and Commitments Made by NNSA |
Letter |
PDF |