Letters

Start Date Sort ascending Title Document Type Document
2014-05-16 Board Letter Regarding Criticality Safety at Los Alamos National Laboratory (LANL) Letter PDF iconPDF
2013-12-06 DOE NNSA Letter Regarding Los Alamos TA-55 Conduct of Operations and Criticality Programmatic Pause: Status and Path Forward Letter PDF iconPDF
2013-09-03 DOE Response to July 17, 2013, Board Letter which Requested a Schedule for Completion of the Los Alamos National Laboratory (LANL) Plutonium Facility (PF-4) Alternate Seismic Analysis Letter PDF iconPDF
2013-08-15 DOE Responses Regarding Criticality Safety Controls at Los Alamos National Laboratory Letter PDF iconPDF
2013-07-17 Board Response to DOE March 27, 2013, Letter Regarding Public and Worker Protection for a Seismic Collapse Scenario at the Los Alamos National Laboratory Plutonium Facility (PF-4) Letter PDF iconPDF
2013-03-27 DOE Response to Board Reporting Requirement Issued January 3, 2013, Regarding Safety Issues at the Plutonium Facility (PF-4) at the Los Alamos National Laboratory (LANL) Letter PDF iconPDF
2013-01-16 DOE Response to Board November 19, 2012, Letter Concerning the Upgrade to the Nuclear Facility Safety Basis for Area G at Los Alamos National Laboratory Letter PDF iconPDF
2013-01-03 Board Issues a Reporting Requirement that Provides the DOE Senior Leadership Assessment of the Current State of Public and Worker Protection for PF-4 Seismic Accident Scenarios at the Plutonium Facility (PF-4) at the Los Alamos National Laboratory (LANL) Letter PDF iconPDF
2012-11-05 DOE Response to Board June 18, 2012, Letter which Issued a Reporting Requirement Concerning Safety Basis and Quality Assurance at Los Alamos National Laboratory (LANL) Letter PDF iconPDF
2012-10-09 DOE Response to Board Reporting Requirement of June 11, 2012, Regarding the Transuranic Waste Facility (TWF) Project Preliminary Design at Los Alamos National Laboratory (LANL) Letter PDF iconPDF