2005-02-02 |
Acknowledgement of Receipt of "White Paper on Impediments to Quality at Los Alamos National Laboratory" |
Letter |
PDF |
2005-01-05 |
NNSA's Draft Request for Proposal (RFP) for the Los Alamos National Laboratory Management and Operating Contract |
Letter |
PDF |
2004-12-16 |
Board Issues a Reporting Requirement for Briefing within 20 Days Responding to Enclosed Comments and to Include Crosswalk |
Letter |
PDF |
2004-11-03 |
Board Issues a Reporting Requirement to NNSA for a Report within 90 Days on the Actions that will be Taken to Identify and Correct any Deficiencies in the Device Assembly Facility, its Equipment, or Safety Management |
Letter |
PDF |
2004-10-07 |
DOE Status of the Waste Management Risk Mitigation and Partial Site-Wide Fire Alarm Replacement Projects at LANL |
Letter |
PDF |
2004-09-13 |
Observations of Restart Efforts and Safety Conditions During the Shutdown of Work Activities |
Letter |
PDF |
2004-09-10 |
Board Grants Request for Second 90 Day Extension from NNSA for Report on Conduct of Engineering at Los Alamos National Laboratory |
Letter |
PDF |
2004-08-09 |
DOE Requesting an Additional 90 Day Extension to Submit Report Regarding Conduct of Engineering and Implementation of DOE Order 420.1A, Facility Safety, at the Los Alamos National Laboratory |
Letter |
PDF |
2004-07-23 |
DOE Revised Implementation Plan for Board Recommendation 2000-1 for Stabilization, Repackaging, or Disposition of Nuclear Materials at Los Alamos National Laboratory |
Letter |
PDF |
2004-06-22 |
Recognition of Ms. Joanne Lorence of the Los Alamos Site Office - Honored as the 2003 Department of Energy Facility Representative of the Year |
Letter |
PDF |