2005-08-24 |
DOE Requests a 60-day Extension to Submit a Report to the Board Regarding Fire Protection Issues at the LANL |
Letter |
PDF |
2005-07-21 |
Observations on Los Alamos Briefing on the Resumption of Laboratory Operations and Corrective Action Plans |
Letter |
PDF |
2005-07-21 |
Confinement Ventilation Systems at the Plutonium Facility (PF-4) at Technical Area 55 of the LANL |
Letter |
PDF |
2005-06-27 |
Board Responses to Questions from the Committee on Energy and Commerce, Subcommittee on Oversight and Investigation, "A Review of Ongoing Management Concerns at Los Alamos National Laboratory" |
Letter |
PDF |
2005-05-31 |
Board Issues a Reporting Requirement for a Report within 60 Days that Outlines NNSA's Plans and Schedule for Safety-Class System Implementation at the Los Alamos Plutonium Facility |
Letter |
PDF |
2005-04-28 |
DOE Provides Requested Report on Resolution of In-Core Temperature Monitoring System Issues at the Los Alamos National Laboratory Technical Area-18 |
Letter |
PDF |
2005-03-25 |
DOE Provides Status on Long-Overdue Commitment to Upgrade Electrical Power at the Plutonium Processing and Handling Facility (TA-55, PF-4) at Los Alamos National Laboratory |
Letter |
PDF |
2005-03-21 |
Completion of Action Regarding the Conduct of Engineering and Implementation of DOE O 420.1A, Facility Safet, at the Los Alamos National Laboratory |
Letter |
PDF |
2005-03-15 |
Design-Build Approach for the Chemistry and Metallurgy Research Facility Replacement at the Los Alamos National Laboratory |
Letter |
PDF |
2005-02-24 |
Board Issues a Reporting Requirement for Briefing within 30 Days of CD-1 Approval to Provide NNSA's Rationale for Use of Design-Build Approach for the CMR-R Project |
Letter |
PDF |