2006-06-19 |
Plans for Staging, Assessing, and Disposition of a Damaged Nuclear Weapon or Improvised Nuclear Device at the G-Tunnel at NTS |
Letter |
PDF |
2006-04-26 |
DOE Device Assembly Facility Safety Basis Implementation Plan |
Letter |
PDF |
2006-03-13 |
DOE Results of Device Assembly Facility Survey of Leak and Crack Loocations |
Letter |
PDF |
2005-11-28 |
Board Issues a Reporting Requirement to NNAA for a Report and Briefing within 60 Days on what Additional Actions will be Taken to Address the Board's Comments on Device Assembly Facility |
Letter |
PDF |
2005-06-15 |
Building Leaks and Structural Cracks at the Device Assembly Facility at the Nevada Test Site |
Letter |
PDF |
2005-05-16 |
Results of a Condition Assessment and Mapping of Building Leaks and Structural Cracks at the Device Assembly Facility At the Nevada Test Site |
Letter |
PDF |
2005-02-08 |
Device Assembly Facility Operations at the Nevada Test Site |
Letter |
PDF |
2004-10-27 |
Board Issues a Reporting Requirement to NNSA for a Report within 90 Days on Archiving Activities Regarding Recommendation 93-6 Implementation Plan |
Letter |
PDF |
2004-07-15 |
DOE Training Assessment for the Device Assembly Facility at the Nevada Site Office |
Letter |
PDF |
2004-05-14 |
DOE Review of Electrical and Lightning Protection and Detection Systems for Facilities at the Nevada Test Site |
Letter |
PDF |